[1]
Dr. Resmi. R 2023. Estimation of Least-Cost Testing Sequence of Continuous Sampling Plan (Csp-1) Using Gert Analysis. Mathematical Statistician and Engineering Applications. 71, 4 (Mar. 2023), 10996–11005. DOI:https://doi.org/10.17762/msea.v71i4.2039.